Prospecting Workspace
Common screens plus per-domain screens for Location, Partnership, and Membership. Evidence and decisions are recorded inline.
Prospecting
Prospecting Screens
0/2 cleared
Common
Mission and brand alignment confirmed across all parties
LocationApplies to: Adjacent Anchor
Anchor adjacency traffic cadence consistent with conversion thesis
Gate Transition
Currently in Prospecting. Next gate: Vetting.
- ●All required screens for Prospecting cleared(0/2)
- ●All applicable thresholds met(4 registered)
Phase Thresholds
- Minimum Grid Capacity Kwgte 480 kW
- Maximum Entitlement Horizon Monthslte 18 months
- Minimum Projected L0 To Paid Conversion Pctgte 8 percent
- Minimum Standalone Utilization Pctgte 22 percent